Nidaplast EP
EP area: clean and self-cleaning storage model

Retention basins are made of modular blocks to prevent flooding in the event of a storm and to regulate the flow of water treated downstream of the system.
This type of installation often presents a dilemma: what if sediment enters the structure, it is impossible to get access for cleaning.
A study conducted at the University of Sheffield (UK) on hydro-clogging has shown that it is possible to prevent contamination of blocks by installing a Nidaplast system with drains at the bottom. In this way, most of the pollution found in precipitation passes directly through the drain and does not pass into the inner blocks.
Furthermore, a study conducted by the Technical Study Center CETE de I’EST on several Nidaplast pools, showed positive performance of the module after more than 10 years of use. The experience gained on more than one million m 3 laid also supports the position of Nidaplast EP / Nidaflow EP as the most secure system on the market, while guaranteeing a reduction in operating costs.
Product | Nidaplast EP | Nidaflow EP | ||
Dimensions | 2400 x 1200 mm | |||
Blocks | No grooves | With grooves | ||
Density | 520 ili 120 mm | 250 mm | ||
Cell size | 50 mm | |||
Weight | 35-50 kg/m3 | |||
Material | Extruded polypropylene | |||
Geotextiles (both sides) | 45 g/m2 | |||
Nidaplast EP and nidaflow EP | ||||
Short-term vertical compression force | 400 kPa | 500 kPa | 600 kPa | |
Permanent load in three layers allowed** | 45 kPa | 65 kPa | 85 kPa |
* For installation, refer to the general installation instructions ** Technical advice Cf
Operational principle

During a storm, water is drained into a tank through one or more collector pipes connected to the manhole. When the inlet flow is greater than the outflow, the water rises slowly in Nidaplast blocks before infiltration and softening.
References:
NIDAPLAST EP mitigation tank
Jeddah (ARS) – 16,000 m3
NIDAPLAST EP infiltration tank
Beaumont-lès-Valence (FR) – 610 m3
NIDAPLAST EP infiltration tank
Venissieux (FR) – 600 m3
NIDAFLOW EP mitigation tank
Mercedes La Garde (FR) – 180 m3
NIDAFLOW EP infiltration tank
Cholet (FR) – 2500 m3
NIDAFLOW EP infiltration tank
Burger King Labège (FR) – 1250 m3